3.1.2 (a) Detailed and comprehensive description of different FGSZ Ltd services offered and their charges 3.1.2 (b) Different types of transportation contracts available for services offered by FGSZ 3.1.2 (c) Network code, standard conditions outlining the rights and responsibilities of all network users 3.1.2 (c) 1. Harmonised transportation contracts and other relevant documents 3.1.2 (c) 2. Specification of gas quality parameters (GCV, Wobbe-index) and costs of conversion for network users in case gas is outside these specifications 3.1.2 (c) 3. Pressure requirements at all certain points 3.1.2 (c) 4. Procedure in the event of an interruption of interruptible capacity 3.1.2 (d) Harmonised procedures applied when using the transmission system, including the definition of key terms 3.1.2 (e) Provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures 3.1.2 (f) Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator 3.1.2 (g) Rules on balancing and methodology for the calculation of imbalance charges Price of balancing gas [IP] 3.1.2 (h) Flexibility and tolerance levels included in transportation and other services without separate charge 3.1.2 (i) Detailed descriptions of the points of the gas transmission system, names of the operators of the interconnected systems 3.1.2 (j) Rules applicable for connection to the system operated by the transmission system operator 3.1.2 (k) Information on emergency mechanisms that can lead to the disconnection of customers groups, other general liability rules 3.1.2 (l) Nomination, matching, allocation, and balancing procedures applied at interconnecting gas transmission systems 3.1.2 (m) Methodology for calculating technical capacities of the gas transmission system 3.3. (1) (a) Technical capacity of gas transmission points in both directions [IP] 3.3. (1) (b) Contracted interruptible and non-interruptible capacities in both directions at all points of the gas transmission system [IP] 3.3. (1) (c) Nominations and re-nominations in both directions [IP] 3.3. (1) (d) Available firm and interruptible capacity in both directions [IP] 3.3. (1) (e) Actual physical flows [IP] 3.3. (1) (f) Planned and actual interruption of interruptible capacity [IP] 3.3. (1) (g) Planned and unplanned interruptions to firm services due to maintenance, restoration information [IP] 3.3. (4) Daily gas quality measures at points [IP] 3.3. (5) Physical, available and booked capacities subject to the current, and the next 10 years [IP] 3.4. (1) Offered and contracted capacities on the secondary capacity market [IP] 3.4. (2) Products and relevant registration, acceptation times on the secondary capacity market 3.4. (3) Network user imbalance and relevant cost data 3.4. (4) Other flexible service not on the occasion of tolerance 3.4. (5) Gas amount per balancing zone in the transmission system [IP] 3.4. (6) User friendly instruments for calculating tarifs Downloadable documents: AttachmentSize 715 2009 EC regulation972.88 KB 715 2009 EC regulation Chapter 3 of Annex I722.22 KB