Sign In

Announcement (02.03.2018) - Interruption at interconnection point Mosonmagyaróvár (EIC: 21Z000000000003C ) flow direction Hungary -> Austria

Subject headingInterruptible backhaul capacities nominated for gas day 3 March 2018 and gas day 4 March 2018 at interconnection point Mosonmagyaróvár (EIC: 21Z000000000003C ), flow direction Hungary -> Austria will be interrupted due to hydraulic reasons
Date and time of publication2018-03-02T16:04:13.264Z
Date and time of incident 
Company publishing the informationFGSZ Zrt.
Name and location of asset concernedMosonmagyaróvár interruptible backhaul capacities, flow direction Hungary->Austria
TSO Member(s) concernedFGSZ Zrt.
Affected capacity of the asset concernedUp to 5.045.921kWh/h backhaul capacity on 03.03.2018 and 04.03.2018
Available capacity of the asset concerned0 kWh/h
Fuel concernedN/A
Estimated time at which the assets concerned will be partly/or wholly available againN/A
Reasons for the unavailability of the assetHydraulic reasons
Any other information necessary for the reader to understand the relevant informationThe 'Special Contractual Terms and Conditions' of FGSZ's Business Code specify the conditions of the usage of backhaul capacities: "In the winter period, backhaul capacity shall be ensured if the nomination submitted for the entry point exceeds 2.157 million kWh/hour after deducting the backhaul demand." The Special Contractual Terms and Conditions is available on FGSZ's website (www.fgsz.hu)
A history of prior publications regarding the same eventN/A


Letölthető dokumentumok :
Csatolmány Méret

© FGSZ Natural Gas Transmission Private Company Limited by Shares 2009–