The Annual Work Schedule of 2020 from 17 July
2020. 07. 17.
The Annual Work Schedule of 2020 has been changed.
The Modified Planned tasks indicated on the published sheet have been modified respect the date information.
For easier transparency, we list planned reductions on Interconnection points.
- Technical capacity will be available in 50% 6:00 21.09.2020 – 06:00 26.09.2020 Mosonmagyaróvár (AT>HU) (KAMOSONM1IIN) Elementary Point.
Work Schedule for the Hungarian Gas Transmission System Subject to 2020 is available on our website: Maintenance Plan, Outages
Best Regards,
FGSZ Ltd., TSO