Changes related to “MOL összevont betáplálási pont (2/H)” and “MOL Babócsa+Endrőd betáplálási pont (2/H)” network points

2025. 09. 29.

Dear Partners,

Please be advised that at the request of the connecting system operator, the elementary points connected to the network point of ‘MOLösszevont betáplálási pont (2/H)’ (Network code: KETELJCS59EN, EIC: 39WKETELJCS59ENY) and „MOL Babócsa+Endrőd betáplálási pont (2/H)” (Network code: KETELJCS60EN, EIC: 39WKETELJCS60ENS) will be divided into the network points stated below starting from 1 October 2025.

The details of the network points are as follows:

  • “MOL összevont betáplálási pont (2/H)”; Network code: KETELJCS59EN, EIC: 39WKETELJCS59ENY, to which the “Endrőd “0” pont’ (Network code: KEENDROD1NNN, EIC: 39WKEENDROD1NNNN) will be added;
  • New network point: ”Babócsa “0” pont”; Network code: GEBABOCS1VEN, EIC: 39WGEBABOCS1VENA.

Please also be informed that at the same time, starting from 1 October 2025, the network point “MOL Babócsa+Endrőd betáplálási pont (2/H)” (Network code: KETELJCS60EN, EIC: 39WKETELJCS60ENS) will be terminated.

For further details, please refer to the document titled “Special contractual terms and conditions” on our website, which will be effective from 1st October 2025. This document also contains additional amendments highlighted in red.

Please also be informed that the quality accounting rules of the entry and exit points of the natural gas transmission system for gas year 2025 – 2026 has been modified accordingly and its REV 2 version in pdf, and excel format was published on the website of the company.

The quality accounting rules can be accessed via the following link:  

FGSZ - Order of natural gas quality accounting

Regards,

FGSZ Ltd.

Subscribe Newsletter