The Annual Work Schedule for Hungarian Gas Transmission System of 2025 has been published
2025. 01. 15.
Dear Partners,
The Annual Work Schedule of 2025 has been published.
For better transparency, we list planned reductions on the Interconnection points.
- 50% of the technical capacity will be available during 06:00 21.05.2025 – 06:00 23.05.2025 Csanádpalota (HU>RO) (KECSANAD1HHN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 21.05.2025 – 06:00 23.05.2025 Csanádpalota (RO>HU) (KECSANAD1IIN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 03.09.2025 – 16:00 04.09.2025 Balassagyarmat (HU>SK) (VEBALASS2HHN) Elementary Point.
- 0% of the technical capacity will be available during 10:00 02.10.2025 – 14:00 02.10.2025 Drávaszerdahely (CR>HU) (GEDRAVAS1IIN) Elementary Point.
- 0% of the technical capacity will be available during 10:00 02.10.2025 – 14:00 02.10.2025 Drávaszerdahely (HU>CR) (GEDRAVAS1HHN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 06.10.2025 – 06:00 10.10.2025 Mosonmagyaróvár (AT>HU) (KAMOSONM1IIN) Elementary Point.
The Gas Connect Austria makes maintenance work on its own system from 6:00 on 10.10.2025 to 12:00 on 10.10.2025. 0% of the technical capacity will be available on the Austrian side of HAG.
The actual sheets are available on our website: Planned Outages
Best Regards, FGSZ Ltd., TSO