The Annual Work Schedule for Hungarian Gas Transmission System of 2026 has been published
2026. 01. 15.
Dear Partners,
The Annual Work Schedule of 2026 has been published.
The missing DSO related data will be published when received.
For better transparency, we list planned reductions on the Interconnection points.
- 50% of the technical capacity will be available during 06:00 05.05.2026 – 18:00 06.05.2026 Csanádpalota (HU>RO) (KECSANAD1HHN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 05.05.2026 – 18:00 06.05.2026 Csanádpalota (RO>HU) (KECSANAD1IIN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 02.06.2026 – 06:00 07.06.2026 Mosonmagyaróvár (AT>HU) (KAMOSONM1IIN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 05.06.2026 – 06:00 10.06.2026 Balassagyarmat (HU>SK) (VEBALASS2HHN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 05.06.2026 – 06:00 10.06.2026 Beregdaróc 800 (HU>UA) (HABEREGD1HHN) Elementary Point.
- 0% of the technical capacity will be available during 06:00 07.06.2026 – 06:00 09.06.2026 Hajdúszoboszló ("FGT" ki) (HAHAJDUS1ONN) Elementary Point.
- 0% of the technical capacity will be available during 06:00 07.06.2026 – 06:00 09.06.2026 Kardoskút (FGT ki) (KEKARDOS1ONN) Elementary Point.
- 0% of the technical capacity will be available during 06:00 07.06.2026 – 06:00 09.06.2026 Pusztaederics (FGT ki) (GEPEDERI1NNN) Elementary Point.
- 0% of the technical capacity will be available during 06:00 07.06.2026 – 06:00 09.06.2026 Zsana (FGT ki) (KEZSANA01NNN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 09.09.2026 – 06:00 12.09.2026 Kiskundorozsma 2 (RS>HU) (KEKISKUD2IIN) Elementary Point.
- 0% of the technical capacity will be available during 10:00 10.09.2026 – 14:00 10.09.2026 Drávaszerdahely (CR>HU) (GEDRAVAS1IIN) Elementary Point.
- 0% of the technical capacity will be available during 10:00 10.09.2026 – 14:00 10.09.2026 Drávaszerdahely (HU>CR) (GEDRAVAS1HHN) Elementary Point.
The Gas Connect Austria makes maintenance work on its own system from 6:00 on 11.06.2026. to 12:00 on 19.06.2026. 0% of the technical capacity will be available on the Austrian side of HAG.
The GASTRANS d.o.o. Novi Sad makes maintenance work on its own system from 6:00 on 02.06.2026. to 6:00 on 07.06.2026. 0% of the technical capacity will be available at the Serbian side
Maintenance works will be carried out on the TurkStream pipeline from 6:00 on 02.06.2026. to 6:00 on 10.06.2026.
The actual sheets are available on our website: Planned Outages
Best Regards,
FGSZ Ltd., TSO