The Annual Work Schedule of 2022 has been changed.
The Modified Planned task indicated on the published sheet have been modified respect the date and the Local Distribution Company concerned information.
For better transparency, we list planned reductions on the Interconnection points.
- 0% of the technical capacity will be available during 6:00 06.09.2022 – 6:00 08.09.2022 Mosonmagyaróvár (AT>HU) (KAMOSONM1IIN) Elementary Point.
- 0% of the technical capacity will be available during 9:00 27.09.2022 – 17:00 27.09.2022 Drávaszerdahely (CR>HU) (GEDRAVAS1IIN) Elementary Point.
- 0% of the technical capacity will be available during 9:00 27.09.2022 – 17:00 27.09.2022 Drávaszerdahely (HU>CR) (GEDRAVAS1HHN) Elementary Point.
The Gas Connect Austria makes maintenance work on its own system from 6:00 on 29.06.2022 to 12:00 on 29.06.2022. 0% of the technical capacity will be available on the Austrian side of HAG.