The Annual Work Schedule of 2023 from 19 May
2023. 05. 19.
Dear Partners,
The Annual Work Schedule of 2023 has been changed.
The Modified Planned task indicated on the published sheet have been modified respect the date and the Local Distribution Company concerned information.
For better transparency, we list planned reductions on the Interconnection points.
- 0% of the technical capacity will be available during 12:00 20.06.2023 – 12:00 22.06.2023 Mosonmagyaróvár (AT>HU) (KAMOSONM1IIN) Elementary Point.
- 0% of the technical capacity will be available during 06:00 07.09.2023 – 16:00 08.009.2023 Balassagyarmat (HU>SK) (VEBALASS2HHN) Elementary Point.
The Gas Connect Austria makes maintenance work on its own system from 6:00 on 20.06.2023 to 12:00 on 20.06.2023. 0% of the technical capacity will be available on the Austrian side of HAG.
The GAZPROM makes maintenance work on its own system from 8:00 on 05.06.2023 to 8:00 on 12.06.2023. 0% of the technical capacity will be available on the Serbian side of Kiskundorozsma 2 (RS>HU).
The actual sheets are available on our website: Maintenance Plan, Outages
Best Regards,
FGSZ Ltd., TSO