The Annual Work Schedule of 2024 from 28 March
2024. 03. 28.
Dear Partners,
The Annual Work Schedule of 2024 has been published.
The Modified Planned task indicated on the published sheet have been modified respect the date and the Local Distribution Company concerned information.
For better transparency, we list planned reductions on the Interconnection points.
- 0% of the technical capacity will be available during 07:00 26.06.2024 – 07:00 28.06.2024 Kiskundorozsma (HU>RS) (KEKISKUD1HHN) Elementary Point.
- 0% of the technical capacity will be available during 07:00 04.09.2024 – 16:00 05.09.2024 Balassagyarmat (HU>SK) (VEBALASS2HHN) Elementary Point.
- 0% of the technical capacity will be available during 06:00 21.09.2024 – 17:00 26.09.2024Beregdaróc 1400 (UA>HU) (HABEREGD1IIN) Elementary Point.
- 50% of the technical capacity will be available during 06:00 23.09.2024 – 17:00 27.09.2024 Mosonmagyaróvár (AT>HU) (KAMOSONM1IIN) Elementary Point.
- 0% of the technical capacity will be available during 08:00 08.10.2024 – 14:00 08.10.2024 Drávaszerdahely (CR>HU) (GEDRAVAS1IIN) Elementary Point.
- 0% of the technical capacity will be available during 08:00 08.10.2024 – 14:00 08.10.2024 Drávaszerdahely (HU>CR) (GEDRAVAS1HHN) Elementary Point.
- The Gas Connect Austria makes maintenance work on its own system from 6:00 on 23.09.2024 to 15:00 on 27.09.2024. 0% of the technical capacity will be available on the Austrian side of HAG.
- The Gas Connect Austria makes maintenance work on its own system from 7:00 on 12.11.2024 to 15:00 on 12.11.2024. 0% of the technical capacity will be available on the Austrian side of HAG.
- Due to maintenance work on the Turk Stream from 8:00 on 04.06.2024 to 8:00 on 11.06.2024 0% of the technical capacity will be available on the Serbian side of Kiskundorozsma 2 (RS>HU).
The actual sheets are available on our website: Planned Outages
Best Regards,
FGSZ Ltd., TSO