GINOP PLUSZ-3.2.1-21
Improving the adaptability and productivity of employees and companies through workforce development
Final beneficiary: FGSZ Natural Gas Transmission Private Company Limited by Shares
Subject and goal of the project: Improving the adaptability and productivity of employees and companies through workforce development
Amount of funding: 7.635.720 Ft
Details of the project:
Committed to gaining knowledge, to ensure a proper team of professionals and also as a step to fulfil high expectations generated by challenges, FGSZ received a 7.635.720 HUF support within the framework of GINOP PLUSZ-3.2.1-21.
The goal of the project is to train professionals who will be able to
- handle, repair, install, operate, control, and maintain explosion proof electric and/or non-electric equipment
 - carry out control measuring, examinations, and settings with the appropriate tools
 - observe safety and environmental protection regulations and make others observe these as well
 - document work activity, find mistakes during operation, handling, and audit
 - realise lifetime tracking
 
The content of the training material:
- explosion safety basics
 - introducing legal measures, basic terminology, general requirements
 - protection modes of explosion-proof equipment
 - structural requirements concerning electric products
 - establishing, installing, and repairing electric equipment in an explosive environment
 - maintenance, reconstruction, renovation, modification of explosion-proof electric and non-electric equipment
 - audit of explosion-proof electric equipment
 - professional practical knowledge
 
Planned timeline of the project: 24. February 2023.